First step in renovating the kitchen was painting and fixing the walls, followed by painting the walls. Next I started hanging cabinets on the walls, followed by base cabinets. I matched the new cabinets to size/location of the old ones (based on where the utility connections were located) so I wouldn't have to move any electrical, plumbing or gas. Here's where I ended last week, with the cabinets installed. I still need the countertop installed (next week), appliances (after the countertops) and install the crown molding (you can see a piece of it laying on the top of the wall cabinets).
We already had the a/c and furnaces replaced a few months ago and that went pretty well, so there's not much left to do to the house, probably 2 weeks more and we'll be ready to go back on the market with it.